Case Study: Water Treatment Keeps Paper Recycling Plant Operational


Gulf Coast

The Challenge: A paper recycling facility in the southern gulf coast region identified a scheduling issue in which a large permanent water treatment plant currently under construction would not be completed in the expected time frame. The water volumes required to resume operations in the paper plant exceeded 500,000 gallons per day. In order to avoid a plant shut-down a temporary treatment facility would need to be erected to store, treat and transport the spent fluid to a nearby disposal facility. The scale of the project and coordination required …

methane emissions reduced for operator ESG